Lade Inhalt...

The procurement strategies for the Olympic Stadium and the Aquatic Centre for the London 2012 Olympic Games

©2009 Masterarbeit 114 Seiten

Zusammenfassung

The study aims to determine [hypothesis] whether the procurement strategies chosen by the ODA (Olympic Delivery Authority) are the right choice for delivering the two main venues in the Olympic Park in time, on budget and to the required quality.
In order to answer this question, the approach of this study is to undertake extensive research in the subject area of construction procurement and to identify best practice in making procurement decisions for a project. In particular, the procurement strategies chosen by the ODA will be researched and their shortcomings identified. Based on this theoretical framework, the author will be able to undertake a systematic analysis of the decisions made by the ODA to procure the two most prestigious venues in the Olympic Park.
As a main part of this analysis the author will conduct semi- structured interviews with key people involved in the Olympics and with experts of the industry. Both the literature review and the interviews will help to achieve the main research objectives of this study, which are summarised below:
• Obtain a better understanding of construction procurement and the key areas affecting the project success
• Identify best practice in selecting a procurement method and to make out the pitfalls and the shortcomings of the procurement strategies that are used for both venues
• Understand why these procurement decisions were made and identify if best practice was followed by the ODA during its procurement process and if the pitfalls of the chosen strategies were counteracted
• Determine if the chosen procurement strategies fit the client & the project

Leseprobe

Inhaltsverzeichnis


Details

Seiten
Erscheinungsform
Originalausgabe
Jahr
2009
ISBN (PDF)
9783961162482
ISBN (Paperback)
9783956366956
Dateigröße
993 KB
Sprache
Englisch
Institution / Hochschule
Kingston University London
Erscheinungsdatum
2018 (Juni)
Note
A
Schlagworte
Einkauf Bauleistung Procurement Olympics Construction Construction Management Olympic Statium Aquatic Centre London 2012
Zurück

Titel: The procurement strategies for the Olympic Stadium and the Aquatic Centre for the London 2012 Olympic Games
book preview page numper 1
book preview page numper 2
book preview page numper 3
book preview page numper 4
book preview page numper 5
book preview page numper 6
book preview page numper 7
book preview page numper 8
book preview page numper 9
book preview page numper 10
book preview page numper 11
book preview page numper 12
book preview page numper 13
book preview page numper 14
book preview page numper 15
book preview page numper 16
book preview page numper 17
book preview page numper 18
book preview page numper 19
book preview page numper 20
book preview page numper 21
book preview page numper 22
book preview page numper 23
book preview page numper 24
114 Seiten
Cookie-Einstellungen